Fleetwing

Submitted by spi on Tue, 05/06/2008 - 13:28

Originally constructed for light parking area duty in 1969, this three-acre paved area served as a truck driver training area, and is now a terminal for trucks and trailers. The superpave asphalt pavement is designed to withstand the high traffic and axle loads required by heavy trucks. This area was upgraded and resurfaced approximately six years ago.